Skip to main content
Home

Kanalbau-Wissen to go!

powered by UNITRACC.de

  • DE
  • PL
  • TR
  • RO
  • BG
  • HU
  • EN
image/svg+xml image/svg+xml image/svg+xml 1 Planning and preparation 2 Excavating the pipe trench 3 Creating a load- bearing trench bottom 4 Creating the lower bedding layer 5 Connecting a lateral drain to a main sewer 6 Pipe handling and placement 7 Compacting the haunch zone 8 Backfilling the sides / covering the pipe 9 Primary backfill 10 Restoring the asphalt layer
 Start
  • Building a sewer line using the open trench method with rigid pipes (concrete)
    • 1 Planning and preparation
    • 2 Excavating the pipe trench
    • 3 Creating a load-bearing trench bottom
    • 4 Creating the lower bedding layer
    • 5 Connecting a lateral drain to a main sewer
    • 6 Pipe handling and placement
    • 7 Compacting the haunch zone
    • 8 Backfilling the sides / covering the pipe
    • 9 Primary backfill
    • 10 Restoring the asphalt layer
    • Quiz – Open trench method – rigid pipes

Footer menu

  • Impressum
  • Datenschutz
www.kanalbau.com

© 2024 Güteschutz Kanalbau e.V.