  • Before each stage of backfilling, pull up the shoring to the required height.
  • Backfill the sides up to the top of the pipe layer by layer.
  • Compact each layer in multiple passes.
  • Direct the force of compaction towards the in-situ soil of the trench wall.0
  • Use only lightweight compaction equipment.
  • Be sure the backfill material is free of stones and foreign substances/objects (e.g. wood, waste, topsoil).

Backfilling the sides

Verdichtung Seitenverfüllung über dem Rohrscheitel nur mit gegeinetem Gerät
i
Note: Compaction equipment must not be used directly above the pipe.
8.1-3-3_1

Covering the pipe

Kunststoff - Seitenverfuellung und Rohrabdeckung verdichtet

4 Covering the pipe

Follow the instructions of the foreperson for the depth of the backfill layer covering the pipe. Minimum depths:

  • above the pipe shaft, > 15 cm
  • above the pipe bell, > 10 cm

Recommended depth of the backfill covering layer in the guidelines (A 139):
– over 30 cm.

  • Before each stage of backfilling, pull up the shoring to the required height.
  • The backfill covering layer should be level and extend across the full width of the trench.
  • Compact the covering layer in multiple passes, directing the force towards the in-situ soil of the trench wall.
  • Use only lightweight compaction equipment.